Light at the end of the tunnel for
The Krishna Tunnel Boring Maching (TBM), which was tunneling between Chikpete and Kempegowda Station, had a breakthrough at 2.04 p.m.
The Krishna Tunnel Boring Maching (TBM), which was tunneling between Chikpete and Kempegowda Station, had a breakthrough at 2.04 p.m.